Minutes of Quick Calorimetry Meeting 13-12-96. Present: KWB, BWK, PSF, ALL, MS. KWB Beam line work frustated by target failure. Next Monday to IC for Endcap simulation meeting. At RAL till 20/12 then away 2 weeks. PSF Ordered parts for improvement of Sheffield rig; gas pipes, fittings and pump diaphragm. Found instructions for Meeko moisture meter which is thought to be broken. ZOx oxygen meter is at Sheffield. Management course 6-10 Jan. then back to Sheffield. ALL Reported on Test beam target problems. Target will not lower, Paul Alexander came down with circuit diagrams and we established that the last contactor was energising and putting volts on the cable which disappears in to the magnet hall to drive the motor. There is only a motor isolator (thought to be a switch) and a plug connecting the motor inside the ring. On checking between neutral and the 3 phases connecting to the motor these were found to be open circuit. So it may be a simple fault but we need an access to check inside the ring, they will call us in event of an ISIS failure requiring access or in silent hours will send down one of the crew. As a long shot MS and ALL got the ISIS crew to increase the bump current as high as possible to try and steer onto the target, they got to 200A where they became unhappy about beam loss and we still did not see any beam down our line. Checked on price and delivery of drive motor with Parvalux in case it is a motor failure. It costs #326 and will be 8 weeks delivery. We cannot order one until we have full information from a plate on the motor. Neil Cunliffe will be available on 24/12 for our first official access when the beam goes off. Working on design for scintillator beam hodoscope, waiting for quote for opto coupler. BWK This week working on annual report, final version ready. Looking at 1997/8 computing predictions for CMS. ISIS beam test data: good separation of protons and deuterons in TOF and Xtal pulse height, beam momentum spread 2.5%. Look at dE/dx for 770 MeV/c deuterons, maximum at edge of crystal i.e. through 20mm of PWO, so with momentum spread of beam some will be stopping. Preparing talk for meeting at IC on Monday, endcap simulations. Next week at RAL. MS Working with ALL on target problems. Still trying to get PC to talk to 'scope. Laurie Lintern 17-12-96.