Minutes of Meeting held on 7th August 1998present: DI, BWK, KWB, HA, PSF, MS, GD, DJAC. (ALL and RMB on leave)DI - Have lost the use of the 4.7T magnet, may get it back at end of September. Absolute calibration of 4.7T magnet system. Technical note on ET VPTs, not finalised as do not understand discrepancy in F value at 4.7T, between measured and calculated. To do, compare gain in low field of VPT used at high field(difference in gain between high and low field systems) Place new order with ET start of September(20VPTs, 6 with radiation hard glass).BWK - Endcap/barrel hermeticity simulation note in draft form (conclusion, an extra 3cm on endcap would be improvement, means extra 100 xtals per quadrant, this with TDR spacing). Talk with Brian and Len re: ISO9001, approved and signed Brian's specification. To do, more simulation on the distance, from the intersection point, of the xtal pointing. Simulation paper, which keeps growing. Geometry note.KWB - Only OPAL work this week.HA - Draft of 1.8T magnet tests on VPTs nearly ready.PSF - Adding section to thesis. Tabulated yields of all samples tested. To do, visit John at Sheffield next Tuesday and Wednesday. More work on thesis.MS - Orders for sorting for 1.8T future set up. Data manipulation for 1.8T report. To do, assist Haider with draft of 1.8T report. More work on future 1.8T system. See Adrian Marsh re: Stephenson preamps.GD - LabVIEW, have built VI for controlling HT supply, and have readout Adam unit, linked to thermocouples, and gaussmeter. To do, more work on gaussmeter. Set up CAMAC readout.(need driver).DJAC - First specification sheets for xtal and mandrel drawn up, Lebeau faxed drawing to Russia so cutting of large xtals can start. Len and John have reappraised the xtal mounting mock-up. Updated Web pages. On leave next week.Martin Sproston, 12th August 1998.