From: RALHEP::LINTERN "Laurie Lintern" 9-JUN-1998 11:25:04.86 To: @QCAL.LST CC: Subj: Minutes of Quickcal meeting 5-6-98 Minutes of Quick Calorimetry Meeting 5-6-98 Present: HA, KWB, RMB, PSF, DCI, BWK, ALL. KWB Working on INTAS document all this week, will be finished today. Next week CERN Thursday, Bert Westwood visit Wedsnesday. PSF This week analysing big block data to write chapter of Thesis. Difference in yields is quite marked, use offcut data to measure yield as as absorption predominates in big block measurements. Look at time constant/yield relationships, it is clear that absorption is the limitation rather than quenching. PMT, VPT and APD measuements of glass when normalised show good correlation. Next week, finish this chapter. ALL Beam hodoscope set up with discriminators ready to plug into pattern units. Complete safety committee requirements in test beam. Working on design of magnet multi VPT test facility. The maximum number of VPT's that can be easily accomodated is 32. Looking at driving with plastic chain or toothed timing belt. Stepper motor/encoder, RS232 and control units estimated cost is #2500. Mechanical work est, at #1500. RMB suggests contacting FJ at CERN for any electronics as RAL CERN loan pool is well stocked. Next week Beam hodoscope and VPT multi test facility. DCI VPT's, a large area photocathode (20mm dia) Hamamatsu with 2000 LPI mesh is available. Produced combined LED/PIN datasheet and Quote (#32.85 ea). ET 10001 is continuing long term test in 4.2T rig, 750 hours now in and out of magnet, looks fairly consistent except for last measurement which was a bit rushed. PSF questions temperature stability, which was considered to be a relevent consideration RMB notes that temperature stability dependent on wavelength and not very stable in the green, a green LED is being used. Looked at cathode leakage current in and out of field and found fluctuations. Discussed with Electron tubes possibilty of gettering to remove residual gas. ET ready to proceed with 25.4mm diameter VPT's, 23mm long and overall length with pins 30mm. They just need mesh size defining. BWK Fitting scans on glass blocks for PSF and fitting field scans of VPT's for MS. Writing up End cap monte carlo. Next week scan analysis and finish writing up End cap document. HA Working with MS on VPT magnet scans. RMB PRH want's to test VPT in 1.8T magnet on Wednesday. Doing APR's. Looking at costing again for next management meeting. Fix budget figures. ECal week - DaveC presented programme of work for End caps. The programme was accepted and presented to Institution board on Friday. CERN beam tests - noise reasonable, Res. for central crystal 1%. Irradiating central crystal for radiation damage test. Next week, more APR's, Bert Westwood visit Wedsnesday. Scientific initiatives document to write for Ken Peach. Laurie Lintern 9-6-98.