Minutes of Quick Calorimetry Meeting 11-9-98.Present: RMB, BWK, ALL.BWK Sorting out Endcap geometry anomalies in CM Sim. CM Sim gives an error of a few hundred microns in crystal position. Worked out a fix and mailed John Hayes, both programs now give correct crystal positions within a couple of microns. Went through with Gillian all her work on Labview, can now control the Le Croy digital 'scope and write Labview to Excel programs. Reading Haida's report. Next week run another Endcap/Barrel simulation now that bugs are sorted out, finish Endcap/barrel sim. technical note.ALL Stepper motor drive still not working, called the firm, Greenwich Instruments, but technical man said I appeared to be doing all the right things. VPT housing can for magnet - much less room than anticipated, trying to shoe horn decoupling card in, have had to order smaller capacitors. Ted Symonds is looking for surface mount high voltage capacitors for the same problem. Finally managed to get 50m of co-ax from Raychem as a sample. Asked Frank for 4 LeCroy 2249A ADC's apparently available in CERN(RAL) Loan pool.RMB Prepared report on highlights of the Vancouver conference and gave the talk on Wednesday. Preparing for CMS collaboration and Management Board meetings at CERN. UK funding and spend profiles for Finance board next week. Next week CMS week in Lyon.Laurie Lintern 14-9-98.