Minutes of Quick Calorimetry Meeting 11-6-99. Present: RMB, PSF, BWK, ALL, MS. ALL Commissioning beam line magnet PC control system. Looked into cost of VPT anode current leakage monitoring for 1.8T test rig. Adam units: need base unit and 4 digital output output modules, total cost #523. HV reed relays, still can only find 8kV ones at #30 each, as this is complete overkill expect to find cheaper ones. Next week continue commissioning magnet control system. PSF Working on irradiation of adhesives and analysing results. MRC have a 2000 Curie source which Paul has negociated to use. Some concern about temperature rise in quartz with high rates. Thesis proceeding, doing 2 hours per day. RMB Working through submissions to Grants committee and Selection panel. Preparing for CMS week and collaboration board meeting. MS Catching up with administrative work. Preparing for VPT lifetime measurements next week. BWK Interview of proposed sandwich student. Simulations, added trigger tower positons, looked with single photons at effect of towers 17,18,19. Increase in energy resolution spread worse at tower 18, this with no special supercrystals. Alan Ball meeting this afternoon ECal/Hcal. Will send simulations for TDR -3 and -6cm. Next week, CMS week. Laurie Lintern 24-6-99.