DJAC made some general comments,
Peter Litchfield(MINOS) has equipment they wish to evaluate in the
HEP
test beam at ISIS, as result we should change our emphasis and
concentrate for the next few months on getting the 1.8T
multi-channel
VPT test system up and running, returning to the test beam when them
5 x 5 test super crystal returns from CERN.
He then encouraged everyone who can, to get involved with the CERN
tests
of the 5 x 5, which take place between 17th - 30th June.
Over the next two years the "Dee" labs will be being set up at CERN
and
we should get involved as much as possible and, where appropriate,
take
responsibility for this work at CERN.
MS - thinking about the daq for the 1.8T system.
Next week, compose document for 1.8T system, to include jobs to be
done
and possible solutions.
ALL - Hardware for magnet control
RA selection.
Next week, compose document for 1.8T system, to include jobs to be
done
and possible solutions.
PSF - JIF bid sent to Peter Hobson.
Resin measurements, question asked why not use existing RTV, as yet
no
irradiation information on this product.
Irradiation tests, awaiting availability of Brunel source, ISIS due
to
restart next week so neutron irradiation can be done.
For existing RTV samples need preparing asap so that it has time to
set.
Sample preparation, now have good cleaning technique (Devcon90 +
water),
suitable for use in production situation.
Still have spectrophotometer base line problem.
JNCS paper, returned for correction still needs to be done, problem
is
that Refereee's corrections of two points give contrary meening
to
that intended.
THESIS - should spend first two hours of each day on this.
Next week, JNCS paper,
resin samples,
irradiation of samples
Thesis.
RMB - LHCB
APRs
Drafting documents
DJAC- APRs
CERN, discussions - LV regulators for endcap, triggering solution in
upper level readout, super module + "dee" test beam requirements,
full "dee" powered when intest beam, H4 infrastructure, fibre
monitoring feed to supercrystals(25 fibres or 1 fibre and diffuser)
Martin Sproston 21st May 1999.
Martin Sproston
Senior Scientific Officer, Particle Physics Department
Rutherford Appleton Laboratory, Chilton, Didcot, OXON OX11 0QX
tel: 01235 445668 fax: 01235 446733
Automatic conversion from plain text file