Present : DJAC, ALL, MS, PRH, DCI, OS, RMB, KWB, JHW, PSF, BWK, CAXP. ALL - All hardware bits for multichannel system, now here, assembly started. Leakage current test box being constructed, awaiting relays. MS - Lifetime tests on further RIE VPTs, #57B being tested at present at zero field due to magnet cooling water system maintenance. PRH - INTAS problem. VPT system still making progress. Still testing Schott face-plates. Still awaiting resistors and capacitors for irradiation. Peter posed the question - should we have a plug put on the end of the VPT flying leads to facilitate testing. consensus was YES to some form of plug. Floating DVM for leakage measurements works fine. (using isolated GPIB bus) DCI - No CMS work to report this week. ** As an aside the questions of barcodes for the VPTs and other parts of the test systems, and the testing of mechanical tolerances were discussed. PRH to discuss barcodes with Helen Heath. First 100 VPTs to be checked extensively mechanically, but general principal is to set up a simple go-nogo test gig. OS - Finishing old project and getting to grips with LabVIEW and understanding the system. RMB - Minutes of the meeting with RIE. Reported on the CMS Finance Board meeting, important statement that there would be a working detector in 2005 and a complete detector in 2006 was given in this meeting. Meeting with Justin Greenhalgh to cover Ecal funding. Esso Flyckt phoned to try getting confirmation on the rumours he had heard concerning the pilot order and to see if it was still worth Photonis providing test sample VPTs, yes. Crystal Task Force met this morning, Bob by video link. There were three scenarios put forward to overcome the problem of funding versus delivery rate of crystals, the first two appeared to be not viable but the third seemed possible, discussions continue. ETH-Zurich are awaiting some info from the manufacturer of preference then the contract will be signed. Provisional acceptance will take place at CERN so that prompt payment can be made. JHW - More work sort Lab 7, tools/equipment ordered. Work on helium test rig. Web-site, security problem. Started helping ALL assemble the multichannel system mechanics. PSF - Helium test rig, set up system using nitrogen, then switched to pure helium, this gave problems very quickly, back to nitrogen and all OK so assume external problem on VPT. Now switch to helium/nitrogen mix, all working fine now. BWK - Reported on VPT test meeting, note from Dave Cussans - one spare five channel card to test and one 5 x 6 channel box by first week of June. The LED used in the Brunel and the RAL test systems should be the same. PC assigned to test beam, now redundant, so upgrade and use for database. CAXP - LabVIEW high voltage power supply driver, wrote own due to problems with the existing and manufacturer supplied ones. Other assorted bits and pieces. DJAC -Test beam at CERN, infrastructure not materialized, help required after 19th June 2000 Endcap cooling has been evaluated by CERN. Safety team from CMS have been to discuss thing with Justin's people. *comment from Justin - the team that visited was connected with cooling only, *safety visit is planned for sometime in June. Martin Sproston 16th May 2000