Quick VPT Test Rig meeting -
minutes
Date of meeting: 19 May 2000
Present: PSF, BWK, ALL, MS, JHW
1. Mechanics
- Bank of 8 VPT holders now glued up
- Al baseplate found to be warped. Sent out for pressing to
correct the problem. Should be back early next week for assembly to proceed.
2. VPT Web Site
- JHW assembling a comprehensive VPT web site, including detailed
flow-charts describing Brunel/RAL pre-production testing.
- Access will be controlled - login name and password available from
JHW.
3. Electronics, HV
- Need to retrieve 2 ADCs currently on loan to Bristol; components for
readout are otherwise complete.
- Magnet control hardware is all here; needs cabling up.
4. AOB
- BWK will contact Peter H to arrange a joint RAL/Brunel meeting at
Brunel, so we can take a look at the Brunel 4T test facility.
Bruce Kennedy /
05 December 2003