Quick VPT Test Rig meeting -
minutes
Date of meeting: 19 May 2000
Present: PSF, BWK, ALL, MS, JHW
1. Mechanics
- Backplate pressing to 3 Tonnes failed to cure the warping. ALL
has sent instruction for machining to allow the side bars to be inserted vertically.
Should be back next week.
- ALL showed a sample of a VPT holder allowing rapid (20 seconds)
insertion of a VPT and connection of flying leads. May need to extend spacer to
allow more room for connectors.
2. VPT Web Site
- Pages are now on the web, after discussions with PPD web experts on
password control. Feedback is welcome, especially on the flowcharts.
3. Electronics, HV
- Matt Probert (Bristol) has our LeCroy ADC. ALL has a
nanoammeter.
- JHW has finished making a single-channel Stephenson preamp for the
He rig.
- After discussion of earthing, PSF will contact SSD group dealing
with electromagnetic interference.
4. LabVIEW
- HT control application in progress.
- Discussion of multi-serial port units. RS have an 8-port
system for £360