Quick VPT Test Rig meeting -
minutes
Date of meeting: 1 September 2000
Venue: RAL
Present: P Flower, B Kennedy, J Williams
- Rail system
- Magnet has been drilled, and swarf collected by radiation protection
expert. Level of activity too low to detect in the hall. Rails are now
installed.
- Readout/daq
- Adam units for magnet driver have arrived. Two left over for
He rig, or other uses.
Bruce Kennedy / 05 December 2003