Quick VPT Test Rig meeting -
minutes
Date of meeting: 22 September 2000
Venue: RAL
Present: PSF, BWK, ALL, MS, AMT, JHW
- VPTs: 30 arrived. ALL has crimped pins to
one VPT, which is now installed in the single test can. JHW has scanned the
passports, which are on the web.
- Hardware: To
improve uniformity of illumination, can design modified to block direct light
& illuminate photocathode via a perspex diffuser. Some slippage of drive
belt encountered during rig rotation - belt tension will be improved to cure
this. ALL has finished & tested current leakage box.
- Software: Windows 98 installed on run control
PC - some changes have been made to the control programs to cope with this.
Bruce Kennedy / 09 February 2004