Quick VPT Test Rig meeting - minutes


Date of meeting: 27 July 2001

Present: PSF, BWK, ALL, MS, JHW


  1. Rig status: Sideplates bolted back on.  Humidity sensors fixed in boxed, still need cabling.  Hall probe is still to do.  MS/DM improving LED driver circuit.
  2. Data: Data files converted to new format.  JHW is investigating using the datastore for long-term storage of the rig data.
  3. Next steps: Go to two rows of 8 cans; repeatability tests with VPTs removed & replaced; noise suppression.