Quick VPT Test Rig meeting -
minutes
Date of meeting: 22 November 2002
Present:
- Status of rig: Production running.
- Brunel report (PRH): Finished measuring latest
batch of 60 at 4T - analysing results. 2 tubes anomalous: 1 ok at 0T,
failed at 4T, 2 failed at both 0T and 4T. Building new prototype torpedo
to hold 3 VPTs. Measured light distribution at faceplate - appears to be
fairly central, as expected.
Bruce Kennedy /
02 February 2004