Quick VPT Test Rig meeting - minutes


Date of meeting: 22 November 2002

Present:


  1. Status of rig: Production running.
  2. Brunel report (PRH): Finished measuring latest batch of 60 at 4T - analysing results.  2 tubes anomalous: 1 ok at 0T, failed at 4T, 2 failed at both 0T and 4T.  Building new prototype torpedo to hold 3 VPTs.  Measured light distribution at faceplate - appears to be fairly central, as expected.

Bruce Kennedy / 02 February 2004