Quick VPT Test Rig meeting -
minutes
Date of meeting: 6 September 2002
Venue: RAL
Present: B Kennedy, L Lintern, M Sproston, J Williams
- Status of rig: New version of software in use -
still needs some developent to handle overcurrent errors. MS is ready to move the
switching box out of the control room. Row 3 needs some extra cables and a little
further development before installation. ALL has finished the lids for row 4.
- Visual inspection: 100 of the latest batch now
inspected - initial impression is favourable. Cathodes are generally uniform, and
off-centre grids seem less common than previously.
- Brunel: PRH requests another batch of 60 tubes for
high-field testing.
Bruce Kennedy / 05 December 2003