Quick VPT Test Rig meeting -
minutes
Date of meeting: 13 September 2002
Venue: RAL
Present: B Kennedy, L Lintern, M Sproston
- Status of rig: Production running - some
overcurrent failures, but all failed tubes have passed a second run.
- Hardware: MS has tested 10 amplifier channels for
row 3 using a single-channel charge-injection system. 25% variation in gain between
highest & lowest. ALL has etched PCBs for row 4.
- Software: JHW working on overcurrent handling.
Bruce Kennedy / 05 December 2003