Quick VPT Test Rig meeting -
minutes
Date of meeting: 5 December 2003
Present: PSF, BWK, ALL, MS, JHW
- Status of rig: Production running. Some
overcurrent problems in recent batches. Expect to finish current batch (up to
bar-code 6900) in week of 15 Dec.
- Dropped VPTs: Following mishap involving several
boxes of VPTs, ALL has visually inspected the tubes from the worst-affected box. 3
new wrinkled grids found. All of the dropped tubes will be retested as soon as
possible.
- VPT sorting for supercrystal: BWK/JHW will ensure
that the necessary databases are correct so that the sorting can be done efficiently.
- R12 storage: JHW will get the shelving into shape
in R12 so that VPTs can be moved there.
- Long-term test system: GPIB cable has now arrived.
The Labview software can talk to the scope, but JHW has a few minor problems to
solve to make the system functional.
- Brunel report (PRH by email): Cryostat successfully
refilled with helium. Omar has sent plots to RAL for VPTs 1118, 1133, and 4035.
VPT measurements continuing. Tests on the non-magnetic chain for new torpedo
show that the more expensive kevlar version is needed, rather than SS wire reinforced
types.
- Safety: Radiation signs in R5.3 are now correct.
Bruce Kennedy /
05 December 2003