Quick VPT Test Rig meeting - minutes


Date of meeting: 19 December 2003

Present: PSF, BWK, ALL, MS


  1. Status of rig: Production running.  Current batch of new VPTs should be finished today.  Retests of dropped tubes has started.   1547 (wrinkled grid after drop) has failed on overcurrent.
  2. Visual inspection: Visual inspection rig will be moved to the Lab 7 darkroom for convenience.  The vacated space in R12 will be used for VPT sorting.
  3. Brunel report (PRH by email): Should finish 4T testing of latest batch today.

Bruce Kennedy / 19 December 2003