Quick VPT Test Rig meeting -
minutes
Date of meeting: 19 December 2003
Present: PSF, BWK, ALL, MS
- Status of rig: Production running. Current
batch of new VPTs should be finished today. Retests of dropped tubes has started.
1547 (wrinkled grid after drop) has failed on overcurrent.
- Visual inspection: Visual inspection rig will be
moved to the Lab 7 darkroom for convenience. The vacated space in R12 will be used
for VPT sorting.
- Brunel report (PRH by email): Should finish 4T
testing of latest batch today.
Bruce Kennedy /
19 December 2003