Quick VPT Test Rig meeting - minutes


Date of meeting: 9 May 2003

Present: KWB, PSF, BWK, ALL, MS, JHW


  1. Status of rig: In production.
  2. Visual inspection: About 200 left to do of current batch.
  3. Maintenance: Schedule maintenance from 14/5 to apply silver paint and make other necessary repairs.
  4. Brunel report: PRH reports that VPT 3662 was unstable - this tube gave high dark current at RAL.
  5. Risk assessment: MS will produce a risk assessment for the rig area.
  6. Opening a VPT: PSF has three tubes to examine.  One unwrapped so far.

Bruce Kennedy / 02 February 2004