Quick VPT Test Rig meeting -
minutes
Date of meeting: 9 May 2003
Present: KWB, PSF, BWK, ALL, MS, JHW
- Status of rig: In production.
- Visual inspection: About 200 left to do of
current batch.
- Maintenance: Schedule maintenance from 14/5 to
apply silver paint and make other necessary repairs.
- Brunel report: PRH reports that VPT 3662 was
unstable - this tube gave high dark current at RAL.
- Risk assessment: MS will produce a risk
assessment for the rig area.
- Opening a VPT: PSF has three tubes to examine.
One unwrapped so far.