Quick VPT Test Rig meeting - minutes


Date of meeting: 26 September 2003

Present: PSF, BWK, ALL, MS, JHW


  1. Status of rig: Rig is back in action after power supply problems.  Initial test runs indicate that the data quality is back to normal.   The diagnosis of the problem was complicated by the fact that both the original power supply and the backup had similar faults on the -6V rail.  More power supplies will be brought back from CERN.  3 will be needed - 1 for the supercrystal area, and two spares.  The water supply has been reconnected after the disruption caused by the beamline work.
  2. Rig development: ALL has finished the mechanics for Row 4.  MS needs some time to set up the electronics.

Bruce Kennedy / 05 December 2003