Quick VPT Test Rig meeting -
minutes
Date of meeting: 13 February 2004
Present: PSF, BWK, ALL, MS, JHW
- Status of rig: In production.
Interlock system now working - magnet, HT and stepper motor are all disabled
when the rig is withdrawn from the magnet.
- Hardware: ALL is finishing the lids for the
refurbished row (old row E). LEDs in this row gave about 50% of expected
light yield - cause not yet known.
- VPT storage: 4 new fridges have arrived in R12.
- Safety: MS is responsible for the R5.2 first
aid box.
Bruce Kennedy /
20 February 2004