Quick VPT Test Rig meeting - minutes


Date of meeting: 13 February 2004

Present: PSF, BWK, ALL, MS, JHW


  1. Status of rig: In production.  Interlock system now working - magnet, HT and stepper motor are all disabled when the rig is withdrawn from the magnet.
  2. Hardware: ALL is finishing the lids for the refurbished row (old row E).  LEDs in this row gave about 50% of expected light yield - cause not yet known.
  3. VPT storage: 4 new fridges have arrived in R12.
  4. Safety: MS is responsible for the R5.2 first aid box.

Bruce Kennedy / 20 February 2004