Quick VPT Test Rig meeting - minutes


Date of meeting: 9 January 2004

Present: PSF, BWK, CL, MS, JHW


  1. Status of rig: Maintenance almost finished.   Row E replaced with new row - old row E will be refurbished and reinstalled at the next maintenance period.
  2. Visual inspection rig: Will move to the Lab 7 darkroom next week.  Will need flat screen in darkroom, as space is limited.
  3. VPTs: 400 new tubes received from RIE on 7/1/04 (up to bar-code 7300).
  4. Single-channel test can: Tony Lodge has the existing single-chanel can.  ALL is making another for long-term stability test system - should be ready early next week.
  5. Safety: Warning lights and interlocks for HT and magnet in progress.