Quick VPT Test Rig meeting - minutes


Date of meeting: 23 January 2004

Present: KWB, PSF, BWK, ALL, CL, MS


  1. Status of rig: 6 preamp boards damaged inadvertently - tantalum capacitors on 5V rail blown.  Bristol have spare boards - should be installed early next week.  Vince Smith has offered to attempt to repair the damaged boards.  The damage occurred because a length of copper tape fell into the low-voltage power supply.  Steps will be taken to prevent any recurrence.
  2. Visual inspection rig: Moved to lab 7 darkroom. ALL has inspected 300 of the latest batch (6901-7300).
  3. VPT grading station:  Set up in R12.  JHW is in process of upgrading the PC to run XP.
  4. VPT storage in R12:  1 fridge is currently under nitrogen, with another awaiting gas connection.  A third is needed to store the current stock of VPTs.
  5. Brunel report:  About to order mechanical and optical parts to complete the multi-VPT torpedo. system.
  6. Safety: Discussion of CE labelling of VPT test rig.  This requires a thorough risk assessment and documentation of safety aspects of rig design.  Interlock and warning lights will be installed as soon as possible after the installation of new preamp boards.

Bruce Kennedy / 23 January 2004