Barrel Sector 3 Documents

Motivation for BSP3

word
pdf
A short description of the RAL evaporative rig
word
pdf
Description of the environmental chamber
word
pdf
Description of PT-100 data acquisition system
in preparation
 
Description of thermal imaging camera
word
pdf
Sector Prototype Numbering Scheme
in preparation
 
BSP Test Set-Up - Configuration One
word
pdf
Determining Temperatatures with PT-100s
word
pdf
Resistance Measurements of Dummy Heaters
word excel
pdf
Data Taking Procedures and Operational Sequences
word
pdf
PT-100 DAQ Channel Numbering for Config 1
word
pdf
Patch Panel Design for Configuration 2
word
 
One wire temerature sensors used from config 2
word
Other Associated & Useful Documents
NIM A485 (2002) 27-42 (T. Kondo et al)  
pdf

Barrel Module FDR document on cooling

soon
Enthalpy-Pressure plot for C3F8
-
pdf
CERN Measurements of Compressor Performance
-
pdf