Barrel
Sector 3 Documents
|
||
Motivation for BSP3 |
||
A short description of the RAL evaporative rig | ||
Description of the environmental chamber | ||
Description
of PT-100 data acquisition system
|
in
preparation
|
|
Description
of thermal imaging camera
|
||
Sector Prototype Numbering Scheme |
in
preparation
|
|
BSP Test Set-Up - Configuration One | ||
Determining Temperatatures with PT-100s | ||
Resistance Measurements of Dummy Heaters | ||
Data Taking Procedures and Operational Sequences | ||
PT-100 DAQ Channel Numbering for Config 1 | ||
Patch Panel Design for Configuration 2 | ||
One wire temerature sensors used from config 2 |
Other
Associated & Useful Documents
|
||
NIM A485 (2002) 27-42 (T. Kondo et al) | ||
Barrel Module FDR document on cooling |
soon
|
|
Enthalpy-Pressure plot for C3F8 |
-
|
|
CERN Measurements of Compressor Performance |
-
|
|