Inlet Connector
Exploded view Date: 18/2/03 Status: Qualification Contact: Ian Wilmut |
Patch Panel
Date: 18/2/03 Status: Qualification Contact: Ian Wilmut |
Patch Panel
Date: 18/2/03 Status: Qualification Contact: Ian Wilmut |
Wiggly Cooling Pipe
Part of inner cooling circuit manufactured at RAL from 70 micron CuNi pipe. Date: 4/7/01 Status: Current Contact: Steve Temple |
Wiggly Cooling Pipe
Detail of a join. Date: 4/7/01 Status: Current Contact: Steve Temple |
Wiggly Cooling Pipe
Detail of a U-bend with swaged ends - manufactured by Uniform Tubes Ltd. Date: 4/7/01 Status: Current Contact: Steve Temple |
Machining of Carbon-Carbon
Shows grain in material. Date: 21/5/02 Status: Current Contact: Ian Wilmut |
Second-point Cooling Block
Carbon-Carbon Date: 21/5/02 Status: Current Contact: Ian Wilmut |
Plated Blocks
An assortment of Carbon-Carbon blocks after they have been given a gold flash. Date: 15/7/02 Status: Current Contact: Ian Wilmut |
Main-Wiggle Pipe
Pipe for Middle circuit being tested in Go-NoGo Jig at UTI. Date: 26/2/03 Status: For CheapO Contact: Ian Wilmut |
Machining of CC Blocks
Sets of Blocks being machined at Brite. PEEK thermal insulation layer can be seen. Date: 26/2/03 Status: For CheapO Contact: Ian Wilmut |
Lower Main Block
As machined by Brite. PEEK thermal insulation layer can be seen. Date: 26/2/03 Status: For CheapO Contact: Ian Wilmut |
Packing of Pipes
Main-Wiggle pipe from UTI in foam packing. Date: 26/2/03 Status: For CheapO Contact: Ian Wilmut |
Cooling Circuit Prep Room at RAL
Room where pipes will be bent, blocks soldered and circuits tested. Date: 26/2/03 Status: Current Contact: Colin Dabinett |
Mini-Wiggle Bending Jig
Shows details of bobbins and bending tool. Date: 26/2/03 Status: Current Contact: Ian Wilmut |
Test stave
Pipe (70um CuNi) with 5 CC blocks (with gold flash). Date: 7/1/01 Status: Test Contact: Ian Wilmut |
Test stave
Close-up, showing blocks with PT100's on side and heaters on top (one each for detector and hybrid side). Date: 7/1/01 Status: Test Contact: Ian Wilmut |
Test stave in Freezer
Pipe (70um CuNi) with 5 CC blocks (with gold flash), 2 Cu blocks and 1m of Cu capilliary. Date: 1/7/01 Status: Test Contact: Ian Wilmut |
Test stave in Freezer
Close-up of Cu capilliary. Date: 1/7/01 Status: Test Contact: Ian Wilmut |
Last updated: 18 Feb 04 Stephen Haywood S.Haywood@rl.ac.uk