Physical Mock-up of End-cap at Sheffield

Support Cylinder
Outside: showing apertures.
Date: 11/7/01
Status: Current
Contact: Craig Buttar
Support Cylinder
Inside: showing position of Discs.
Date: 11/7/01
Status: Current
Contact: Craig Buttar
Disk Assembly
Patch Panels on back of Disc.
Date: 12/3/03
Status: Current
Contact: Craig Buttar
Services on Support Cylinder
Power Tape coilled in distribution box.
Date: 12/3/03
Status: Current
Contact: Craig Buttar
Services on Support Cylinder
Power Tapes being laid on Support Cylinder
Date: 12/3/03
Status: Current
Contact: Craig Buttar
Services on Support Cylinder
Power Tapes and PPF0 viewed through apertures on Support Cylinder.
Date: 12/3/03
Status: Current
Contact: Craig Buttar

Physical Mock-up of Quarter Disc at Glasgow

Front of Disc
Picture shows: support made of compressed fibre; outer cooling circuit; part of inner cooling circuit; mock-ups of wiggly power tapes; a dummy hybrid.
Date: 4/7/01
Status: Current
Contact: Steve Temple
Front of Disc
Enlargement centred on the dummy hybrid.
Date: 4/7/01
Status: Current
Contact: Steve Temple
Back of Disc
Picture shows: support made of compressed fibre; middle cooling circuit; wiggly power tapes which have been brought through aperture as well as over the disc to identify preferred routing.
Date: 4/7/01
Status: Current
Contact: Steve Temple
Back of Disc
Detail showing a 120-way horizontal patch panel - now looking at vertical patch panel.
Date: 4/7/01
Status: Design will change
Contact: Steve Temple

Back to RAL SCT EC Engineering

Last updated:                    19 Mar 03
Stephen Haywood                  S.Haywood@rl.ac.uk