Support Cylinder
Outside: showing apertures. Date: 11/7/01 Status: Current Contact: Craig Buttar |
Support Cylinder
Inside: showing position of Discs. Date: 11/7/01 Status: Current Contact: Craig Buttar |
Disk Assembly
Patch Panels on back of Disc. Date: 12/3/03 Status: Current Contact: Craig Buttar |
Services on Support Cylinder
Power Tape coilled in distribution box. Date: 12/3/03 Status: Current Contact: Craig Buttar |
Services on Support Cylinder
Power Tapes being laid on Support Cylinder Date: 12/3/03 Status: Current Contact: Craig Buttar |
Services on Support Cylinder
Power Tapes and PPF0 viewed through apertures on Support Cylinder. Date: 12/3/03 Status: Current Contact: Craig Buttar |
Front of Disc
Enlargement centred on the dummy hybrid. Date: 4/7/01 Status: Current Contact: Steve Temple |
Back of Disc
Detail showing a 120-way horizontal patch panel - now looking at vertical patch panel. Date: 4/7/01 Status: Design will change Contact: Steve Temple |
Last updated: 19 Mar 03 Stephen Haywood S.Haywood@rl.ac.uk