Practice Cylinder
General view. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Practice Cylinder
Close-up of surface. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Practice Cylinder
Close-up of aperture. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Practice Cylinder
Close-up showng excess resin. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Practice Cylinder
Close-up showing imperfections. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Practice Cylinder
Close-up showing imperfections. Date: 9/12/02 Status: Test manufacturing. Contact: Jason Tarrant |
Short Test Cylinder
General view. Date: 7/2/03 Status: Prototype. Contact: Jason Tarrant |
Short Test Cylinder
General view. Date: 7/2/03 Status: Prototype. Contact: Jason Tarrant |
Short Test Cylinder
Being measured on the RAL CMM. Date: 24/3/03 Status: Prototype. Contact: Jason Tarrant |
Cylinder and Wings
At PCI Date: 1/5/03 Status: Manufacturing. Contact: Jason Tarrant | Word doc with multiple photos |
ITE Cylinder
At PCI. Date: 3/7/03 Status: Manufacturing. Contact: Jason Tarrant |
ITE Cylinder
At PCI - note Cylinder is slightly deformed under its own weight. Date: 3/7/03 Status: Manufacturing. Contact: Jason Tarrant |
Support Structure
Complete view - last time Structure will be together before installation in ATLAS. Date: 31/10/03 Status: Production Contact: Jason Tarrant |
Front Support
Front Support and In-Fill Panels. Date: 31/10/03 Status: Production Contact: Jason Tarrant |
Rear Support
Rear Support and ITE. Date: 31/10/00 Status: Production Contact: Jason Tarrant |
Testing the Front Support
Front Support load test, servo-hydraulic load underneath and LVDTs measuring deflection. Date: 31/10/03 Status: Testing Contact: Jason Tarrant |
Load-check
1.5 x prrof load, view inside full structure. Date: 31/10/03 Status: Testing Contact: Jason Tarrant |
The Team
Jason, Chris and Monika (2nd, 3rd and 4th from left) Date: 31/10/03 Status: Testing Contact: Jason Tarrant |
Acceptance testing at Liverpool
The "Gauge Cylinder" Tooling to test inner radius - note rotating blade top-right. Date: 20/1/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at Liverpool
Testing the outer radius using a tool in contact with rotating blade. Date: 20/1/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Surveying the Fixation Holes in the Supoort Cylinder. Date: 24/1/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Preparing to measure the Front Wing on CMM. (Who is mystery person holding it?) Date: 24/1/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Testing Disc 8 in Support Cylinder with undersized Pins (to test effect of enlarging 15 mm Disc Holes). Date: 5/2/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Looking through Cylinder - left-to-right: Chris, Stephen and Jason. Date: 5/2/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Close up of Disc, looking through Cylinder. Date: 5/2/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Pin going through Cylinder to support Disc. Date: 5/2/04 Status: Acceptance Contact: Jason Tarrant |
Acceptance testing at RAL
Pin going through Cylinder to support Disc - note gold ring to mark location of Hole before it is enlarged to 19 mm. Date: 5/2/04 Status: Acceptance Contact: Jason Tarrant |
Cylinder Support Frame
Ooops ! The trolley isn't big enough. Date: 19/3/04 Status: Preparation for Insert placement Contact: Chris Nelson |
Cylinder Support Frame
Stewart squashes a RAL physicist. Date: 19/3/04 Status: Preparation for Insert placement Contact: Chris Nelson |
Insert Hole modification by PCI
The two Cylinders at PCI. Date: 19/3/04 Status: Preparation for Insert placement Contact: Chris Nelson |
Insert Hole modification by PCI
Jig for enlarging holes. Date: 19/3/04 Status: Preparation for Insert placement Contact: Chris Nelson |
Insert Hole modification by PCI
Holes being enlarged. Date: 19/3/04 Status: Preparation for Insert placement Contact: Chris Nelson |
Protype Wing
In RAL inspection on CMM. Date: 01/11/00 Status: Test manufacturing. Contact: Chris Nelson |
Protype Wing
Frequency testing at Oxford. Date: 01/12/00 Status: Test manufacturing. Contact: Chris Nelson |
Last updated: 25 Feb 05 Stephen Haywood S.Haywood@rl.ac.uk