Actual Run - Photo's taken by Stephen Haywood
Click on photo for enlargement.
Loading at Liverpool
-
Back of lorry.
-
Front of lorry.
-
Forklift.
-
Preparation in Clean Room.
-
Danny (Jnr), Andy, John & Danny (Snr).
-
Preparing Shocklogs.
-
Wheel.
-
In Clean Room.
-
Shocklog cable.
-
Leaving the Clean Room.
-
Wheel.
-
Wheels raised.
-
Wheels raised.
-
John Tomlinson (insurance rep) with John Gaynor (driver) lookin at empty lorry.
-
Forklift.
-
Preparing to enter pockets of Pallet.
-
Tines fully inserted.
-
Carrying the End-cap out.
-
The Workshop staff.
-
About to enter the lorry.
-
Entering the lorry.
-
Entering the lorry.
-
Pushing box into lorry.
-
Fixing the load-lock bars.
-
Load-lock bar in place.
-
Tim praying before the End-cap.
-
Fastening the box with a strap.
-
Temperature recorder.
-
Grounding connection.
-
Spectators.
-
Closing the Lorry.
-
Applying security tags.
-
Stopping the traffic.
-
Off it goes.
-
Leaving the Physics Department.
Unloading at CERN
-
Forklift.
-
Fork extensions - these proved too wide.
-
The Lorry arrives.
-
Side of Lorry.
-
Danzas Team infront of Forklkift.
-
Lorry parked on plank to make more horizontal, with supports at back.
-
John removing security tags.
-
End-cap in Lorry.
-
Security tags after removal.
-
Tim attaching an additional external Shocklog.
-
Trying to engage Pallet with Fork extensions - fit was too tight.
-
Pippa wells, Mike Tyndel, Richard Apsimon & Tom Wegleius.
-
Engaging Pallet without Fork extensions, but with woodedn chocks.
-
Lifting the Box.
-
Extracting the Box.
-
Extracting the Box.
-
Moving the Box.
-
Approaching SR1.
-
Entering SR1.
-
Tim testing the Shocklogs.
-
First view inside the box - the services.
-
First view inside the box - the Inner Box.
-
Wheels attached to the Tranpsort Frame (not Pallet).
-
Temporary Patch Panel.
-
First glimpse of End-cap.
-
Trays of desicant near TPPs.
-
First view of Disc 1.
-
LMT Tray - some Trays have slipped slightly.
-
LMT Tray - some Trays have slipped slightly.
-
LMT Tray Housing.
-
Velcro tab has come unstuck.
-
End-cap moved off Pallet.
-
Pallet with some scratches.
-
The Liverpool/Sheffield team plus Mike Tydel (Project Leader).
-
Moving End-cap into Clean Room.
-
Installed in Clean Room.
-
Remove panels.
-
Remove inner frame.
-
Remove inner frame.
-
Remove bubble wrap.
-
End-cap under mylar sheet.
-
Loose piece of foil from Optofibre wrapping.
-
First view of End-cap.
-
First view of End-cap.
-
Disc 1 uncovered (temporarily).
-
A view into the End-cap.
Last update: 27 Feb 06
Contact Stephen Haywood (RAL)