Actual Run - Photo's taken by Stephen Haywood

Click on photo for enlargement.

Loading at Liverpool

  1. Back of lorry.
  2. Front of lorry.
  3. Forklift.
  4. Preparation in Clean Room.
  5. Danny (Jnr), Andy, John & Danny (Snr).
  6. Preparing Shocklogs.
  7. Wheel.
  8. In Clean Room.
  9. Shocklog cable.
  10. Leaving the Clean Room.
  11. Wheel.
  12. Wheels raised.
  13. Wheels raised.
  14. John Tomlinson (insurance rep) with John Gaynor (driver) lookin at empty lorry.
  15. Forklift.
  16. Preparing to enter pockets of Pallet.
  17. Tines fully inserted.
  18. Carrying the End-cap out.
  19. The Workshop staff.
  20. About to enter the lorry.
  21. Entering the lorry.
  22. Entering the lorry.
  23. Pushing box into lorry.
  24. Fixing the load-lock bars.
  25. Load-lock bar in place.
  26. Tim praying before the End-cap.
  27. Fastening the box with a strap.
  28. Temperature recorder.
  29. Grounding connection.
  30. Spectators.
  31. Closing the Lorry.
  32. Applying security tags.
  33. Stopping the traffic.
  34. Off it goes.
  35. Leaving the Physics Department.

Unloading at CERN

  1. Forklift.
  2. Fork extensions - these proved too wide.
  3. The Lorry arrives.
  4. Side of Lorry.
  5. Danzas Team infront of Forklkift.
  6. Lorry parked on plank to make more horizontal, with supports at back.
  7. John removing security tags.
  8. End-cap in Lorry.
  9. Security tags after removal.
  10. Tim attaching an additional external Shocklog.
  11. Trying to engage Pallet with Fork extensions - fit was too tight.
  12. Pippa wells, Mike Tyndel, Richard Apsimon & Tom Wegleius.
  13. Engaging Pallet without Fork extensions, but with woodedn chocks.
  14. Lifting the Box.
  15. Extracting the Box.
  16. Extracting the Box.
  17. Moving the Box.
  18. Approaching SR1.
  19. Entering SR1.
  20. Tim testing the Shocklogs.
  21. First view inside the box - the services.
  22. First view inside the box - the Inner Box.
  23. Wheels attached to the Tranpsort Frame (not Pallet).
  24. Temporary Patch Panel.
  25. First glimpse of End-cap.
  26. Trays of desicant near TPPs.
  27. First view of Disc 1.
  28. LMT Tray - some Trays have slipped slightly.
  29. LMT Tray - some Trays have slipped slightly.
  30. LMT Tray Housing.
  31. Velcro tab has come unstuck.
  32. End-cap moved off Pallet.
  33. Pallet with some scratches.
  34. The Liverpool/Sheffield team plus Mike Tydel (Project Leader).
  35. Moving End-cap into Clean Room.
  36. Installed in Clean Room.
  37. Remove panels.
  38. Remove inner frame.
  39. Remove inner frame.
  40. Remove bubble wrap.
  41. End-cap under mylar sheet.
  42. Loose piece of foil from Optofibre wrapping.
  43. First view of End-cap.
  44. First view of End-cap.
  45. Disc 1 uncovered (temporarily).
  46. A view into the End-cap.

  • Last update: 27 Feb 06
    Contact Stephen Haywood (RAL)