EDR-06, Sep 02 pre-EDR, May 02 Workshop, Mar 02 EDR-04, Nov 00
EE Jamboree, 31.3 - 2.4.03 link
ECAL EDR-06 , 3-4 Sep, 2002 EDMS
Conclusions | A Herve doc pdf edms | |
Frontispiece | doc | |
Contents | doc pdf | |
EE Animation | J Hill avi (6.6MB) | |
Proposed Agenda (29.8.2002) | doc pdf | |
EE Glossary of terms | ||
1. Introduction and Scope | doc ppt | |
2. Basic structure of EE | J Greenhalgh ppt | |
3. Major mechanics | 3.1 Introduction | J Hill ppt |
3.2 Backplate | J Hill doc ppt | |
3.3 Ring Flange | J Hill doc ppt | |
3.4 Shims | A Levin pdf | |
3.5 Environmental Shield | A Levin pdf | |
3.6 Envelopes | J Hill ppt | |
4. Analysis and tests | 4.1 Introduction | J Greenhalgh doc ppt |
4.2 Structural |
4.2.1 Backplate and ring flange | A Abramov doc ppt |
4.2.2 Environmental Shield | V Gusev doc figs ppt | |
4.3 Thermal |
4.3.1 Introduction | J Greenhalgh ppt |
4.3.2 EE/SE tests | J Greenhalgh ppt | |
4.3.3 Region behind backplate | J Greenhalgh ppt | |
4.3.4 Environmental Shield (outer, front, backplate) |
A Riabov ppt |
|
4.3.5 Environmental Shield (inner) |
I Wichrowska-Polok ppt |
|
5. Dee Assembly | G Barber doc ppt | |
6. Services | 6.1 Introduction | J Greenhalgh ppt |
6.2 Thermal analysis | A Riabov ppt | |
6.3 Concluding remarks | J Greenhalgh ppt | |
7. Installation | A Surkov pdf Individual figure set link |
|
8. QA issues | J Greenhalgh ppt | |
9. Timescales | Overview | J Greenhalgh ppt |
Detailed plan | J Greenhalgh mpp | |
Mini plan presentation | J Greenhalgh mpp | |
UK Project specification document |
J Greenhalgh pdf
appendix1 |
|
10. Formal response to EDR-04 issues | D Cockerill pdf ppt | |
Procedures section | ||
11. Summary and conclusions | J Greenhalgh ppt |
EDR Chapter separators doc pdf
Pre-EDR Workshop, 17 May, 2002
Conclusions |
P Bloch doc J Greenhalgh txt |
Agenda, Fri, am, 17 May, 2002 | doc |
Dee Mechanics, envelopes | J Hill, --- |
Thermal FEA update | J Greenhalgh, link |
EE Services | J Greenhalgh, ppt |
EE planning | J Greenhalgh, link |
EE Workshop, 12-14 March, 2002
Conclusions and action list | D Cockerill, pdf |
Services issues | J Greenhalgh, ppt |
Agenda | doc |
Tue, March 12, 2002 | |
Goals | D Cockerill, doc |
Pre EDR intro, EE planning & critical paths | J Greenhalgh, ppt pdf |
Proposed scope of next EDR | D Cockerill, doc |
Design criteria for EE mounting/dismounting | D Cockerill, doc |
Wed (am), March 13, 2002 | |
EE Mechanical design | J Hill, ppt |
Environmental Screen | A Levine, doc pdf dxf |
Dee Assembly | G Barber, ppt |
EE fibre optic routing, Dee MEM box | M Anfreville, doc |
Mechanical FEA - background | J Greenhalgh, A Abramov ppt pdf |
EE/HE FEA analysis | A Abramov, doc |
EE/HE FEA analysis, during installation | A Abramov, ppt |
EE/HE FEA analysis, during operation | A Abramov, ppt |
Installation in CMS | A Surkov, doc pdf |
Wed (pm), March 13, 2002 | |
ECAL cooling system | P Baillon, ppt |
EE Thermal issues | J Greenhalgh, ppt pdf |
Thermal FEA, backplate | A Riabov,J Greenhalgh ppt |
Thermal FEA, front environmental screen | A Riabov,J Greenhalgh, ppt |
Thermal FEA, outer environmental screen | A Riabov,J Greenhalgh, ppt |
Thermal FEA, eta = 3 region | I Wichrowska-Polok, ppt |
Thermal FEA, eta = 3 region, cross section | I Wichrowska-Polok, doc |
EE Services | S Bally, pdf |
EE Services | P Ingenito, pdf |
EE Services | J Greenhalgh, ppt pdf |
Thursday, March 13, 2002 | |
Overview - ECAL Electronics | P Sharp, doc |
Electronics integration in EE | A Lodge, ppt |
Low voltage issues | W Lustermann, pdf |
VPT High voltage system | R Brown, ppt |
VPT mass production status | R Brown, ppt |
EE Trigger Issues | K Bell, ppt |
ECAL EDR-04, 28 Nov 2000
EDR-04 report by A Herve edms
Submitted documents for EDR-04, EE | edms | |
EDR-04 chapters + some figures, EE | files | |
EDR-04 discussion, RAL, Jan, 2000 |